Branches in0 of 9
Countries1
ValueNot priced
Countries the plane draws on1 of 7
Active branch
Index / Supply Chains / Plane
Aluminium from France, titanium from Kazakhstan, carbon fibre from the US, wings from Wales, fuselage sections from France and Germany, a tailplane from Spain, a tail fin floated down the Elbe, engines from near Paris and landing gear from the Pyrenees. 9 branches meet in Hamburg, and 1 jet flies to the Gulf.
Summary
9 branches, 7 countries, 1 jet
Legs
Every leg of the chain. Distances are straight lines between the points on the globe.
| Leg | From | To | What | How | Packed | Distance or time | Cost |
|---|---|---|---|---|---|---|---|
| 1 | Issoire | Broughton and Nordenham | Aluminium plate | Road* | Plates and bars | About 1,000 km to Hamburg region† | Not published |
| 2 | Titanium mills | Engine and gear plants | Titanium | Road and sea* | Bar and forgings | Varies | Not published |
| 3 | Carbon fibre plants | Stade | Prepreg | Refrigerated freight* | Cold rolls | Not published | Not published |
| 4 | Broughton | Hamburg | Wings | BelugaXL | A pair of wings | About 850 km† | Not published |
| 5 | Saint-Nazaire | Hamburg | Fuselage sections | Beluga* | Equipped sections | About 1,100 km† | Not published |
| 6 | Getafe | Hamburg | Tailplane | Beluga* | 1 tailplane | About 1,800 km† | Not published |
| 7 | Stade | Hamburg | Tail fin | Pontoon on the Elbe | 1 fin | About 25 km† | Not published |
| 8 | Villaroche | Hamburg | 2 engines | Road | Engine stands | About 740 km† | $14.5 million each, list |
| 9 | Bidos and Gloucester | Hamburg | Landing gear | Road* | Gear sets | About 830 to 1,400 km† | Not published |
| 10 | Hamburg | Sharjah | The finished jet | Delivery flight | Flown by its own crew | About 4,900 km† | About $64 million paid |
Chokepoints
| Step | Who | If it stops |
|---|---|---|
| Wings | Broughton | The only source of A320 family wings |
| Transport | 6 BelugaXLs | Wings and sections move between countries on 6 aircraft |
| Engines | CFM, Villaroche | Every LEAP-1A so far has had its final assembly there; about 60 airframes waited for engines in 2026 |
| Tail fin | Stade | Builds the fin for every A320 family jet |
| Titanium | A few producers | Russia still supplies about 20% |
Paperwork
| Rule | Set by | Where | What it does |
|---|---|---|---|
| Type certificate | EASA | The design | Approves the A321neo design; every jet built must match it |
| Export certificate of airworthiness | Country of manufacture | Before the flight out | Says the jet matches its approved design when it leaves |
| Bill of sale | Airbus and the buyer | At handover | Transfers ownership |
| Registration | UAE GCAA | Before entry into service | Registers the jet in the UAE, with an A6- mark |
| International Registry | Cape Town Convention | Online | Records ownership and any lender’s interest in the airframe and engines |
| Overflight permits | Each country on the route | Delivery flight | Clears the route, which depends on airspace open in 2026 |
Risk
| Where | Risk | What happens |
|---|---|---|
| Engines | Supply | Finished airframes wait as gliders until engines arrive |
| Titanium | Sanctions | About 20% still comes from Russia |
| Beluga | Capacity | 6 aircraft carry the big parts between 4 countries |
| Gulf | Airspace | Closures in 2026 can lengthen the delivery flight |
Gaps
Sources